Ultra Electronics PMES, Defence Power Systems, Signature Management Systems, Transit Power Systems, Navigation and Data Systems, Traction Substations, DC Substations, helicopter, helitrack, rotor balance, Railway Substation Equipment, Traction substations, Traction Power systems, Traction power supply systems, DC systems, DC power supply, DC power systems, DC substations, railway substation equipment, transformer rectifier, TRU, TRUs, Rectifiers, SingaporeTransformer Rectifiers, TRU, TRU's, Kernovel, magnetic silencing, seismic,sensor, sensors, magnetometers, fluxgate, compass, heading reference, Measurement, Range, Multi-influence, measuring magnetic fields, measuring electric fields, underwater electric field, acoustic, electric, transportable, land, harbour, open, sea, D.G., DG, Degaussing, roll, stray, eddy current, Signatures, Mathematical, modelling, FEA, Gradiometers, Treatment, deperming, ICCP, Advanced, on board, closed loop, deamping, threat analysis, active shaft grounding, ICCP, finite element analysis, warship, submarine, corrosion, ATAHS, TAM, AMR, LNS4-3, TAG, AMR, MUWS3, MUWS9, MUWS10, railway power supplies, metro systems, traction current rectifiers, control consoles, navigation systems, integrated bridge systems, torpedo defence, system integration, data processing unit, nautical data unit, DPU, NDU, gyro, meteorological system, ships data distribution system, SDDS, INS, magnetic compass, bridge console, data distribution system, GPS, echo sounder, autopilot, nav system, IBS, AIS, ECDIS, low latency, dual redundant
 News

Click here to read the latest news.

  PMES Relocation to a new site


The story of our new building.

The move by Ultra to a prestigious £5.5m building on the Towers Business Park, Rugeley was funded by the sale of the old site.

The design and build of the facility was by TS Contracts Limited with Project Management by King Sturge LLP.

The building operations began in February 2008 and PMES moved into the building in February 2009.

Below is the story of the build told in pictures taken throughout the construction of the building.


The ground is prepared, February 2008


The steelwork is up, April 2008


The cladding goes on, May 2008


The shopfloor during the construction of the building, August 2008


The office area, ready to receive furniture, October 2008


The shopfloor ready to be fitted out with machinery, January 2009


An aerial view of the completed building, January 2009